The draft of the new Clinic Terres del Ponent de l’Aliança Lleida, which is under development, foresees the implementation of two new buildings, one of them destined to consultations and services, and the other to hospitalization. In addition to it, a 2 basement parking with 306 spaces may be built. A total of 19,392 m² are destined to the hospital and 8,625 m² to the parking area.
The new clinic will have 120 beds (80 of them in single rooms and 4 suites), 6 ICU beds and 10 boxes of ASC (day surgery units). It will have 5 operating rooms and 2 local surgery ones, 4 delivery rooms and a 24-hours emergency department. It will cover almost all medical and surgical specialties, providing the most advanced diagnostic technology: MRI, CT, endoscopies and cardiology scans. It will also have a significant offer in terms of outpatient visits, diagnostic imaging, various testing and complementary examinations cabinets, emergency laboratory and clinical pharmacy. Together with cafeteria and kitchen.
Scope, Challenges and Accomplished Objectives
- Project Management services with special attention to building facilities. On the one hand projecting first class technological facilities and on the other providing the building with sustainable measures, especially designed for energy saving.